Trailer Magazine


NHVR trials new PBS Design Approval process

  • Posted on Thursday 5th, September 2019.

The National Heavy Vehicle Regulator (NHVR) is trialling a new process for Performance-Based Standards (PBS) Design Approval applications submitted in the lead up to the next PBS Review Panel meeting.

The new process, according to the NHVR, is in response to industry feedback will include the following steps:

  • PBS Design Approval Applications received by close of business Friday 13 September will be considered by the Panel out of session, as per normal processes.
  • PBS Design Approval Applications received between Monday 16 September and Tuesday 8 October:
  • that are complex in nature or for a novel type of combination, may be directed to the Panel for consideration at their October meeting; or
  • that are for common combination types or pre-advised designs, will be submitted to the Panel out of session for consideration, as per normal processes.
  • PBS Design Approval Applications received from Wednesday 9 October will be considered by the Panel out of session, as per normal processes.

The PBS Review Panel meeting will be held at NHVR’s Brisbane office on 29 and 30 October.

In other news, after utilising Performance-Based Standards (PBS) last year to gain approval to operate B-quads in Victoria, New South Wales and Queensland, vegetable grower Rocky Lamattina & Sons is reaping the rewards of ultra-efficient B-quad combinations.

© Copyright Prime Creative Media. All rights reserved.

Find us on Google+